Now the weather turns cool, hot melt construction, more prone to fall off the problem. According to past experience, it is best that the temperature of the hot melt kettle is between 230 degrees and 240 degrees, and the temperature in the hopper cannot be lower than 200 degrees. The coating agent has also taken a long time to dry, and now it can be dried in two hours. The non-stick tire time of normal temperature coating is about ten minutes in summer, and now it also needs one to two hours. The complete drying time is 24 hours, pay attention to the sprinkler during construction, and then one day in advance and one day after construction can not sprinkle water, sprinkler words easy to fall off, wear resistance is not good. Attention, everyone, if the construction is currently under construction or will be carried out, we should explain it to the customers and make it clear to them in advance to avoid subsequent falling off problems.